The Story
Not only is this flowery foundation garden filled with clay-tolerant plants, but theyāre arranged in a way that protects the homeās foundation from damage that clay soil can cause. This mix of plants will provide year-round color and texture for maximum curb appeal.
Featured plants include bee balm, coneflower, switchgrass, arborvitae and more easy-care perennials and shrubs.
This Clay Soil Garden Plan performs best inĀ full sun to part shade and cold zones 4 to 9.
WHAT YOU GETĀ
TheĀ Clay Soil garden planĀ is an 8-page pdf file. It includes:Ā
  ⢠The garden illustration shown aboveĀ
  ⢠Overhead plan viewĀ
  ⢠Tips on taking care of your new gardenĀ
  ⢠Detailed plant list with cold-hardiness zonesĀ
 ⢠PLUS, 4-page bonus article Lazy Gardener's Guide to Weeding & What to Do When

Details & Craftsmanship
Every detail has been carefully considered to bring you the perfect product.
Description
Not only is this flowery foundation garden filled with clay-tolerant plants, but theyāre arranged in a way that protects the homeās foundation from damage that clay soil can cause. This mix of plants will provide year-round color and texture for maximum curb appeal.
Featured plants include bee balm, coneflower, switchgrass, arborvitae and more easy-care perennials and shrubs.
This Clay Soil Garden Plan performs best inĀ full sun to part shade and cold zones 4 to 9.
WHAT YOU GETĀ
TheĀ Clay Soil garden planĀ is an 8-page pdf file. It includes:Ā
  ⢠The garden illustration shown aboveĀ
  ⢠Overhead plan viewĀ
  ⢠Tips on taking care of your new gardenĀ
  ⢠Detailed plant list with cold-hardiness zonesĀ
 ⢠PLUS, 4-page bonus article Lazy Gardener's Guide to Weeding & What to Do When























