šŸŽ‰ Up to 70% Off Selected ItemsShop Sale
Garden Arbor Woodworking Project
HomeStore

Garden Arbor Woodworking Project

Garden Arbor Woodworking Project

$16.95
Garden Arbor Woodworking Project—
$16.95

The Story

Step-by-step garden project plans from our friends at Garden Gate magazine.


Everyone who sees this arbor in our garden feels drawn to it, and wants to walk through its arches. And that after all, is the reason for an arbor — to make your garden more attractive and inviting.

CONSTRUCTION
The Garden ArborĀ is 91-3/4 inches high x 75 inches wide x 47 inches deep. We designed it to be assembled in smaller sections to make it easy to break down and reassemble. And we show how to anchor the arbor to concrete pads.

WHAT YOU GET
TheĀ Garden Arbor Wood ProjectĀ is a nine-page, 1.36MB pdf file. It includes complete, step-by-step instructions and 23 detailed drawings, as well as a cutting diagram and a materials list.

Garden Arbor Woodworking Project - Image 2

Details & Craftsmanship

Every detail has been carefully considered to bring you the perfect product.

Description

Step-by-step garden project plans from our friends at Garden Gate magazine.


Everyone who sees this arbor in our garden feels drawn to it, and wants to walk through its arches. And that after all, is the reason for an arbor — to make your garden more attractive and inviting.

CONSTRUCTION
The Garden ArborĀ is 91-3/4 inches high x 75 inches wide x 47 inches deep. We designed it to be assembled in smaller sections to make it easy to break down and reassemble. And we show how to anchor the arbor to concrete pads.

WHAT YOU GET
TheĀ Garden Arbor Wood ProjectĀ is a nine-page, 1.36MB pdf file. It includes complete, step-by-step instructions and 23 detailed drawings, as well as a cutting diagram and a materials list.

Garden Arbor Woodworking Project | The Old Farmer's Almanac Store